Power and utility
When the lights go out, our crews are already rolling.
Since the nor'easter of December 1993, D&M has been at the forefront of disaster recovery, restoring power every day, round the clock. Our line crews and inside wiremen have worked storms across the Northeast, the Midwest and the Gulf Coast.

- Restoring since
- December 1993
- Hurricane Sandy
- Nearly 50 crew members
- Outages
- 24/7 dispatch
What we do
9/11: an office complex in one week
In 2001 D&M was part of the disaster recovery team for The Bank of New York, turning a vacant building in Pleasantville, NY into offices and a data center for employees displaced by 9/11. We set tractor trailer loads of poles, built an overhead distribution system and installed parking lot and site lighting in one week, ahead of schedule.
Hurricane Irene: a water plant in 5 days
In 2011 the City of Yonkers Water Treatment Plant flooded with 25 feet of water, destroying the main switchgear and motor control centers. Under an emergency contract, D&M replaced nearly every component of the electrical service in 5 days, mobilizing in knee deep water while the last of it was pumped out.
Hurricane Sandy
Nearly 50 D&M employees from the electrical and utility divisions worked 16 hour shifts, 7 days a week, for nearly a month until every client was restored.
Storms we have worked
- Winter storm, February 2016: Eversource, Middletown, CT
- Wind storm, June 2015: Eversource, Newtown, CT
- Ice storm, February 2014: PECO Energy, PSE&G Long Island
- February 2013 blizzard: National Grid, Massachusetts
- June 2012 derecho: DTE Detroit, FirstEnergy Ohio and West Virginia
- Hurricane Sandy: Northeast Utilities, Westchester County, Entergy
- Hurricane Irene: Northeast Utilities, City of Yonkers, Westchester County
- Hurricane Ike: Entergy Texas, Port Arthur, TX
- Hurricane Gustav: Entergy New Orleans, LA
Often paired with
Start a project
Tell us about the job. We will tell you how we would build it.
Send drawings, a scope or a question. For an outage, call any time.
