Renewables and energy
Energy storage, from one of the first installers in the New York area.
D&M installed some of the very first energy storage systems in the New York area. A few years later, utility grade installations of 20 to 100 MW are the norm, and they need medium voltage interconnections with complex switchgear and relay schemes.

- Delivery
- Full EPC or subcontract
- Scale today
- 20 to 100 MW systems
- Region
- The Northeast
What we do
Every level of service
Full EPC (engineer, procure and construct), basic electrical subcontracting, or anything in between. Budgeting, site evaluation, permitting and approval support, turnkey installation, or just the medium voltage interconnection.
Why experience matters here
Generation capacity and fault mitigation limits in specific areas make the race to get systems approved fast. Consultants unfamiliar with each utility's requirements can lose valuable time getting the right scheme approved. Our team includes former utility professionals who can quickly find the best option for your project.
Proof in the field
At 4 West Red Oak Lane in Harrison, D&M was prime contractor for one of the largest energy storage installations in a commercial building in New York, completed turnkey in less than 60 days.
Often paired with
Start a project
Tell us about the job. We will tell you how we would build it.
Send drawings, a scope or a question. For an outage, call any time.
