Southern Westchester Executive Park feeder relocation

Two 15kV feeders for a 12 building office park relocated inside a 24 hour weekend window others said was not feasible.

Office park
12 buildings, 800,000 sq ft
Window
24 hours, one weekend
Generators staged
7 trailer mounted units
D&M crews and bucket trucks staged in a parking lot

Photo: D&M crews in the field.

ProCon Construction was building a Hampton Inn at the park, and the first step was to relocate two 15kV feeders that supplied the entire office park and ran through the hotel's footprint. The original design did not allow one feeder to be taken out at a time, and tenants needed the work done on a weekend in 24 hours or less.

After a long planning session with the utility, D&M pre-staged seven 1 and 1.5 megawatt trailer mounted generators at the transformers across the campus. Con Edison de-energized the park at 9AM Saturday. Six D&M crews moved the campus onto generator power while two more cut back conduits and spliced both feeders at two manholes, with relief crews staged around the clock.

All work, including testing, was finished well ahead of the window, and Con Edison re-energized the campus at 9AM Sunday.

“Truly a great story of teamwork and ingenuity both on the business side and the technical. Practicality, innovation and compromise all were brought to bear to make it happen.”
Bob Weinberg, Robert Martin Developers