Photo: D&M crews in the field.
D&M installed 106 new utility poles ranging from 30 to 90 feet tall to support antennas and cabling along the Harlem, Hudson, New Haven, Waterbury, Danbury and Port Jervis lines in New York and Connecticut.
All of the equipment sat inside the railroad right of way, so much of the work happened at night with access by high rail equipment. Outage windows along the tracks were short, so D&M electricians prefabricated equipment off site to support the D&M line crews doing the installations.
The project also included several miles of fiber optic and power cabling along the New Haven line. D&M's experience in both pole line construction and transit work made a very difficult project safe and successful.