Regeneron's constant expansion at its Tarrytown campus required additional high voltage feeders to balance load. D&M was awarded the prime contract for concrete reinforced duct banks, manholes and new 15kV, 500 kcmil copper feeders, plus all splicing, termination and testing.
D&M performed every scope in house except site work, which was subcontracted to Montesano Brothers, Inc. The duct bank system, nearly 2 miles of 5 inch conduit, ran through an active 150 acre campus spanning the Town of Mt. Pleasant and the Town of Greenburgh, including road crossings from the Powerhouse building to the South Campus.
D&M crews then pulled nearly 2.5 miles of 15kV cable and made the splices and terminations. The cutover required switching the whole campus to standby generators while the new feeders were spliced in. Value engineering returned credits to the owner and brought the project in on time and under budget.