
Photo: D&M crews in the field.
LaFarge converted its Buchanan, NY sheetrock plant to synthetic gypsum, which meant new offshore platforms in the Hudson River. D&M won both the site electrical and the offshore electrical contracts. The largest platform carried a crane that needed a 15kV feeder, specified in 5 inch rigid conduit along a catwalk.
That conduit was too heavy for the catwalk, and its bends would have intruded on an exclusion zone. D&M designed a steel messenger cable on the existing conveyor towers with a submarine cable lashed to it, transitioning into underwater rated fiberglass reinforced epoxy conduit on the tower foundations, then into the river bed, and back up to the main switchgear.
D&M Utility linemen (IBEW Local 1249) and D&M inside wiremen (IBEW Local 3) installed it with divers from Atlantic Subsea. A fiber optic inner duct went in at the same time to cut costs. D&M splicers made the terminations under the Raychem MVPower program, qualifying the job for a 20 year factory warranty.
